SiGe Plan (Construction Sites)
On a German construction site where several employers work, the Construction Site Ordinance (Baustellenverordnung, BaustellV) puts duties on the client (Bauherr): announce larger sites to the authority in advance, appoint a health and safety coordinator (SiGeKo), draw up a health and safety plan (SiGe-Plan) and compile a file for later works on the structure. The SiGe plan module takes you through these duties per project: it works out which duties apply, holds the plan with its work sequences, overlaps and coordination measures, and produces the PDFs for the authority and for the site.
Warning
The module supports the coordinator's work. It does not replace the SiGeKo, the coordinator's professional judgment or a legal review. Appointing a coordinator does not release the client from their own responsibility.
Who can use it
The module is only offered to companies whose regulatory country is Germany. Construction sites in Austria or Switzerland are not supported. For every other company the module does not appear at all, not even as a switch in Company Settings.
To get started:
- Switch the module on. In Company Settings, the module list contains SiGe plan. Once enabled it appears in the navigation under Records.
- Activate the framework. The first time you open SiGe plan, the page shows Construction Site Ordinance not yet activated. A Key user or Admin presses Activate Construction Site Ordinance, which adds the framework to the company's Additional Frameworks (you can also switch it on there in Company Settings). Standard users see the same notice without the button.
Viewing and authoring are open to Standard, Key user and Admin. Confirming, publishing and issuing are reserved for Key user and Admin. Basic users do not see the module. The table under Roles below has the details.
The SiGe plan hub
SiGe plan opens a list of your projects. Each card shows the state of the duty assessment (No assessment yet, Assessed or Re-assessment due). Use Search projects… and the filters All, Pre-announcement due, Re-assessment due and AI suggestions to find the projects that need attention.
Opening a project shows Assessment and documents with five rows:
- Duty assessment
- Health & safety plan
- Site plan
- Pre-announcement
- File for later works
Each row shows whether that duty is required for this project and the state of the document. When a pre-announcement is due, a deadline banner sits at the top of the page.
Duty assessment
The Duty assessment decides which BaustellV duties apply to the project. Under Project inputs you enter:
- Planned working days on site
- Peak workers on site at the same time
- Estimated person-days across all trades
- Employers working on site
- Solo self-employed working on site
- More than one employer on site: derived from the two counts above; you can override it, but then a reason is required
- Later works on the structure are foreseeable
- The Particularly hazardous work checklist (Annex II BaustellV): mark each item Present or Absent for this project. Nothing is pre-ticked.
Once the plan has work packages, the assessment offers values from them (Adopt from work packages), for example the working days or the person-days. Values are marked as manual or derived.
The result shows each duty as REQUIRED, NOT required or NOT evaluable (when an input is missing):
| Duty | Required when |
|---|---|
| Pre-announcement | more than 30 working days and more than 20 workers at the same time, or more than 500 person-days |
| Health & safety plan | more than one employer on site and either a pre-announcement is required or Annex II work is present |
| File for later works | later works on the structure are foreseeable |
A Standard user can Save assessment. A Key user or Admin then presses Confirm assessment; the confirmation is shown with name and date. Every assessment is kept in the Assessment history and is never edited or deleted. When the inputs or the work packages change later, the project is flagged Re-assessment due and the page asks you to Re-assess.
The plan
The Health and safety plan has these sections: Overview, Work sequences, Hazards and measures, Shared facilities, Overlaps, Revisions and Events.
In the header you record the Responsible coordinator (a free-text name), the Client (picked from your customer catalogue or entered manually; the choice is saved on the project) and the Planned period.
Work packages
Under Work sequences you create one work package per trade with Add work package. Each work package holds:
- Trade: one of the 20 construction trades in the catalogue, for example Earthworks, Scaffolding, Roofing or Electrical
- Zones: the project's locations. If no zone fits and you are allowed to add locations, Add location creates one directly from the picker.
- Date range
- Performed by: a contractor, or free text. If left empty, your own company is assumed.
- Expected workers
- Annex II: pre-filled from the trade; any deviation needs a justification
- Notes
Matrix
Switch from List to Matrix to see the schedule: trades against calendar weeks (CW), rows grouped by zone. Annex II work is marked, overlaps are shaded and a line marks today. The matrix is read-only; tap a bar to open and edit that work package.
Overlaps and hazards
The module checks the work packages for spatial-temporal overlaps: pairs of different trades whose date ranges overlap in the same zone or in an adjacent zone (zones that sit next to each other under the same parent in the location tree).
Each overlap is compared against 20 stored trade-coordination rules, for example "demolition against every other trade in the same zone" or "excavation next to a standing scaffold". The result is one of three levels:
- Coordination required
- Coordination recommended
- Overlap without a rule reference: no rule is stored for this pair, so check it yourself
Where a rule applies, the overlap shows its Required coordination measures and the rationale. The check is advice only: it never blocks a work package or a date.
From an overlap, Create hazard opens a new hazard that already names the two work packages. Once a hazard covers it, the overlap changes from Open to Covered by a hazard.
Hazards and measures
A hazard has a Title, a Description, the Affected work packages, optionally a link to a Hazard from the risk assessment, and one or more Coordination measures. Each measure has a text, a Responsible party and at least one cited provision; free text alone is not enough. The provisions come from 16 stored regulations, including ArbSchG, BaustellV, ArbStättV, BetrSichV, GefStoffV, RAB 30, RAB 31, RAB 32, DGUV Vorschrift 1, 3 and 38, DGUV Regel 100-500 and 112-198, TRBS 2121 and ASR A1.3. A hazard without a measure stays Open.
Under Shared facilities you record what several trades use together, such as scaffolding, a crane, access routes, sanitary facilities, first aid, storage or the power supply, with zones, a responsible person and the period of availability.
AI suggestions
For an overlap you can Request AI suggestion. The AI drafts a hazard with coordination measures and provision references for that pair of trades. The draft does not enter the plan directly: it lands as a suggestion marked Awaiting decision, and a Key user or Admin chooses Accept, Accept with edits or Reject. Accepted hazards keep an AI-suggested marker, also in the PDF. A revision cannot be published while suggestions are still pending.
The suggestions are generated with Gemini on Vertex AI in an EU region and count against your company's AI budget. If the allowance is used up, the app says so; it renews with the next day or month. Suggestions are written in German; a machine-translated version is marked as not authoritative, the German text is.
Note
AI suggestions are switched on per regulatory framework. Whether they are available for your plan is shown in the app: if they are not yet available, the app shows AI suggestions are not available for this framework yet.
Revisions and the PDF
A plan starts at No plan yet, becomes In preparation when it is created, and moves to In ongoing revision with its first published revision. That step is final.
While no overlap exists, the plan carries the badge Draft — not site-specific: a plan without overlaps does not yet describe the coordination on this particular site.
A Key user or Admin presses Publish revision (the first time: Publish the first revision). The sheet lists the changes since the last revision and asks for:
- a Reason for this revision (at least 10 characters)
- a Trigger: New trade, Change of zone or schedule, New Annex II activity, Incident or accident, Changed measure or Other
Every revision is immutable. You can open any earlier revision read-only and export Revision N as PDF. The PDF contains the header, responsibilities, key figures, work sequences, overlaps, hazards with measures, shared facilities and a site-plan page. Events lists everything that happened to the plan: created, revisions, saved and archived entries, and AI suggestions with their decisions.
Site plan
The Site plan puts the project on its drawing. Upload a PNG, JPEG, WebP or PDF file (from a PDF, exactly one page is used; maximum 25 MB) and draw the zones as polygons on it. Drawing needs a screen at least 600 px wide; on a phone the site plan is view-only.
A week scrubber moves through the plan period and shades zones by their overlaps in that week. Switch the layers on and off:
- Permits (active)
- Incidents (open)
- Actions (open)
- Hazardous materials
- Contractors on site
One symbol stands for one record in that zone; tap it to open the record.
Pre-announcement
The Pre-announcement (Vorankündigung) is the notification to the authority, with a version to post on site. Its Entries follow Annex I BaustellV: location of the site, the client, the type of project, a third party acting instead of the client, the coordinator, anticipated start and duration, the maximum number of workers, the number of employers and solo self-employed, and the employers already selected, plus the transmission date.
- The Client (Bauherr) card takes the client from your customer catalogue or a manual entry. Without a client, transmission is not possible.
- Update from project data fills the fields again from the project, the assessment, the plan and your company record. Before it overwrites a manual entry, it asks.
- Under Coordination, switch on Also for the planning phase only if you also coordinate the planning phase.
- The deadline is 14 days before the start of work. The page shows how many days are left or by how many days it is overdue.
The status runs Draft → Transmitted → Posted on site. Transmit records the transmission date and creates the first version. When key data changes later (coordinator, key figures, additional employers), the app shows Material change detected — a new version is required. and you create a new version with a reason.
Two PDFs are available: the PDF for the authority and the Posting PDF for the site.
Note
There is no electronic submission. Send the PDF to the authority by post or e-mail.
File for later works
The File for later works (Unterlage für spätere Arbeiten) follows RAB 32. Under Building parts and later works you add one entry per building part and Kind of later work: Maintenance, Cleaning, Inspection, Repair or Other recurring works. Each entry holds:
- Hazards: entered by hand, or taken over from the plan's hazards and the project's risk assessments
- Measures: what to observe or provide for the work, such as anchor points
- Hazardous substances: chosen from your hazardous-substance register, plus free-text notes for substances the register does not hold
- Supplementary information: As-built documents, Contact persons and the Maintenance interval
Issue version N records the current state as an immutable version, and each version can be exported as a PDF.
Roles
| Action | Standard | Key user | Admin |
|---|---|---|---|
| View projects, plans and documents | ✓ | ✓ | ✓ |
| Fill in and save the duty assessment | ✓ | ✓ | ✓ |
| Edit work packages, hazards, facilities and the site plan | ✓ | ✓ | ✓ |
| Request AI suggestions | ✓ | ✓ | ✓ |
| Activate the Construction Site Ordinance framework | ✓ | ✓ | |
| Confirm the duty assessment | ✓ | ✓ | |
| Publish plan revisions | ✓ | ✓ | |
| Transmit the pre-announcement, create versions | ✓ | ✓ | |
| Issue versions of the file for later works | ✓ | ✓ | |
| Accept or reject AI suggestions | ✓ | ✓ |
Basic users have no access to the module. Under Feature Access in Company Settings these rights can be narrowed for your company, but not widened beyond this table.
Questions and limits
Does QuickInspect send the pre-announcement to the authority? No. The app produces the PDF and records when you transmitted it. You send it yourself by post or e-mail.
Does the overlap check stop work? No. Overlaps and their levels are advice for the coordinator. Nothing is blocked.
Can we use the module for sites in Austria or Switzerland? Not yet. The module only covers the German BaustellV.
Is the module legal advice? No. It structures the coordinator's work and documents it. The SiGeKo remains responsible for the coordination, and the content of the plan should be reviewed by a qualified person.
Related
- Risk Assessment — hazards you can link or take over into the file for later works
- Permit to Work — active permits shown on the site plan
- Hazardous Materials — the register the file for later works draws on
- Legal Register — the obligations behind the coordination duties
- AI Generation — how AI usage and budgets work